- 阅读权限
- 100
- UID
- 21662
- 注册时间
- 2007-10-14
- 最后登录
- 2012-2-5
- 金钱
- 31502
- 在线时间
- 7634 小时
- 分享
- 0
- 精华
- 84
- 记录
- 2
- 好友
- 181
- 主题
- 207
- 日志
- 1
- 相册
- 0
- 帖子
- 24969
- 积分
- 51367
- 威望
- 210
- 贡献
- 34
- 积极性
- 242
     
- 积分
- 51367
- 威望
- 210
- 贡献
- 34
- 积极性
- 242
|
您前面说,我认为:没有“严格的体系管理水平和数据统计管理”作保证,如 至少达到严重品质特性之Cpk≥2,主要品质特性之Cpk≥1.33,次要品质特性之Cpk≥1。单单使用MIS-STD-1916 中的抽样和判定方法,会出问题的,因该标准只是将抽样和判定方法作为一种次要的附加方法,其判定的门槛并不高。
这样的认识和该标准的原来意思恐怕不同吧。我把原文引用如下,请参考,请注意红色部分。
4.1 Acceptance by contractor-proposed provisions.
4.1.1 General.
a. This standard, when referenced in the contract or product specifications, requires the
contractor to perform sampling inspection in accordance with paragraph 4.2 and the
product specification. However, it is recognized that sampling inspection alone does
not control or improve quality. Product quality comes from proper product and
process design and process control activities. When such activities are effective,
sampling inspection is a redundant effort and an unnecessary cost. Contractors that
have an acceptable quality system and proven process controls on specific processes
are encouraged to consider submitting alternate acceptance methods for one or more
contractually specified characteristics. In addition, contractors that have a successful
quality system and a history of successful process controls relevant to the
products/services being procured in this contract, are encouraged to consider
submitting a systemic alternate acceptance method for all the contractual sampling
inspection requirements associated with paragraph 4.2.
b. Submissions shall describe the alternate acceptance methods, the sampling
inspection provision to be replaced, and an evaluation of the protection provided by
the alternate methods as compared with the inspection requirement to be replaced.
The alternate acceptance method shall include evidence of process control and
capability during production together with adequate criteria, measurement, and
evaluation procedures to maintain control of the process. The acceptability of the
alternate acceptance methods is dependent upon the existence of a quality system,
the demonstration of its process focus, and the availability of objective evidence of
effectiveness.
4.1.2 Requirements and procedures.
a. Contractors currently operating quality systems in accordance with such models as
MIL-Q-9858 enhanced with Statistical Process Controls (SPC), ANSI/ASQC
Q9004, or others that are deemed satisfactory to the Government representative are
qualified to apply for alternate acceptance methods if demonstration of process focus
and objective evidence of effectiveness exists.
b. The contractor shall include in his request for approval of an alternate acceptance
method an assessment plan to periodically verify process stability, capability, and
other conditions under which the alternate acceptance method was developed. The
current minimum values of process capability are equivalent to a Cpk of 2.00 for
critical characteristics, 1.33 for major characteristics, and 1.00 for minor characteristics. Upon approval of the assessment plan, the contractor may reduce or
eliminate inspection sampling when the plan criteria are met or exceeded. |
|